Abstract | Unutar elektroenergetskog sustava nalazi se mnoštvo grana i čvorova, vodovi i transformatori definiraju grane sustava, a sabirnice su čvorovi. Potrošnja snage u sustavu tokom cijelog dana se mijenja, te iz toga razloga radne točke generatora se mijenjaju u skladu sa promjenom potrošnje. Prvo poglavlje je uvodno. U drugom poglavlju prikazan je postupak formiranja sustava nelinearnih jednadžbi. Sabirnice povezuju sve elemente elektroenergetskog sustava, te kako one predstavljaju čvorove između njih dolazi do tokova snaga. Ukupna snaga čvora se definira kao razlika prividne snage generatora i prividne snage potrošača. Čvor predstavlja mjesto u kojem se spaja više grana. Prikazane su metode proračuna tokova snaga: Gaussova iterativna metoda, Gauss-Seidelova iterativna metoda, Newton-Raphsonova iterativna metoda. U trećem poglavlju je objašnjen programski paket EMTP-RV. EMTP je akronim za „Electromagnetic Transients Program“. To je softverski alat koji koriste inženjeri elektroenergetskih sustava za proračun tokova snaga i za analizu elektromagnetskih prijelaza (generički "EMT") i povezanih problema s izolacijom. To je bitan alat za učinkovitu i točnu simulaciju prijelaznih pojava. Nema ograničenja u veličini simulirane mreže. U četvrtom poglavlju je pokazan postupak korištenja programa i postavljanja parametara za svaki od elemenata. U algoritmu tokova snaga korištena je Newtonova iterativna metoda. Postoje tri vrste čvorova koji se koriste za proračun tokova snaga i to su: referentni čvor, generatorski čvor, čvor opterećenja. Referentni čvor služi za određivanje svih ostalih napona u mreži pa se obično za kut napona uzima vrijednost nula, a napon 1 unaprijed je zadan pri čemu njegova vrijednost odgovara nazivnom naponu ili se uzima 1 =1,0 p.u (engl. per unit) u jediničnoj metodi proračuna. U petom poglavlju dan je numerički primjer proračuna tokova snaga za zadanu mrežu. Ukoliko je potrebno uvesti nove proizvođače ili potrošače u mrežu to se također može simulirati te na taj način dobiti predodžbu o mreži kakva bi bila u tom slučaju. Za neke je potrošače jako bitna kvalitetna opskrba električnom energijom i konstantan napon pa je u takvim situacijama ovaj proračun iznimno koristan i bitan. |
Abstract (english) | Within the power system there are many branches and nodes, lines and transformers define the branches of the system, and busbars are the nodes. Power consumption in the system changes throughout the day, and for this reason the operating points of the generator change in accordance with the change in consumption. The first chapter is introductory. In the second chapter, the process of forming a system of nonlinear equations is presented. Buses connect all elements of the power system, and as they represent nodes between them, power flows. The total power of the node is defined as the difference between the apparent power of the generator and the apparent power of the consumer. A node represents a place where several branches join. The methods of power flow comptutation are presented: Gauss iterative method, Gauss-Seidel iterative method, NewtonRaphson iterative method. The EMTP-RV software package is explained in the third chapter. EMTP is an acronym for "Electromagnetic Transients Program". It is a software tool used by power system engineers to compute power flows and to analyze electromagnetic transients (generic "EMT") and related insulation problems. It is an essential tool for efficient and accurate simulation of transient phenomena. There is no limit to the size of the simulated network. In the fourth chapter, the procedure for using the program and setting parameters for each of the elements is demonstrated. Newton's iterative method was used in the power flow algorithm. There are three types of nodes used for the computation of power flows: reference node, generator node, load node. The reference node is used to determine all other voltages in the network, so usually the value of the voltage angle is taken to be zero, and the voltage is predetermined, with its value corresponding to the nominal voltage, or 1 =1.0 p.u (per unit) is taken in unit method of computation. In the fifth chapter, a numerical example of power flow computation for a chosen network is given. If it is necessary to introduce new producers or consumers into the network, this can also be simulated and thus get an idea of the network as it would be in that case. For some consumers, high-quality electricity supply and constant voltage are very important, so in such situations this budget is extremely useful and important. |